Contaminated sites sustainable management strategies
21 SEPTEMBER MONDAY
17.00 – 19.00 CEST (Central European Summer Time)
Opening
17:00 Welcome and introduction from the Chairs
Wouter Gevaerts (NICOLE), Juliana Rolla (Pro-Natura), Roberto Jelínek (Slovak Ministry of Environment)
Presentations
17:10 Cost-Effective Destruction of Petroleum Hydrocarbon Contaminants with Expedited Residual Mass – Smear Zone (LNAPL) Destruction under Anaerobic Conditions via Biostimulation
Kent C. Armstrong (TerraStryke Products)
17:25 Brownfield Revitalization and Future Value Increase with a High-Resolution Site Characterization Approach
Sandro Souto, Cesar Malta, Camilo Chaves, Mateus Evald, ,Guilherme Varela, Milly Saturnino, Ana Carolina Corredori (FINKLER Ambiental)
17:40 Constructing a 1 Km River near downtown Toronto, Canada, through Contaminated Land: Risk Based Strategy, Maximized Soil Treatment and Reuse and Land Use Controls
Meggen Janes (Waterfront Toronto)
17.55 Integrated management strategy for Usina Presidente Vargas (upv) megasite
José Carlos Rocha Gouvêa Júnior (Companhia Siderúrgica Nacional)
18.10 Impacts not evaluated from the construction of mining projects, to the origin of large damages to the infrastructure of the Moquegua region, south Perú: the case of Quellaveco
Hernando Núñez del Prado Simons (Universidad Nacional de Moquegua, UNAM)
18:25 Panel discussion moderated by chairs
19:00 End of the session
Powered by:
Powered by: